 How does the In‑Progress indicator issue field work? Export knowledge base Export     SubscribeSubscribe      Show article info

The In-progress issue field shows a the proportion of actual time vs estimated time on the issue.

 

In addition to the In-progress field itself, you need to enable these two fields (Actual time and Est. time) in the issue field configuration to make the In-progress field work properly.

 

The percent progressed is calculated as follows: Actual time on issue divided with the estimated time on the issue, times 100.

 

If you add actual time on the issue, or add worklog time to it, while the estimated time is 0, then the calculation will result in a value of 100%, as the actual time is equal to or greater than  the estimated time (which is zero).