This portlet chart shows the average time in a status for a project over time

You have to select input in the dropdown lists for project and time interval before you can see a chart! The time interval spans from the selected value (for example 4 weeks) to the present.

This is a bar chart, with one bar per status.

The height of each bar corresponds to the average number of hours an issue has spent in this status, for all issues in the project that were set to this status during the selected time interval.  

Example: The total time interval selected is 6 months. Each bar represents one status, say 'assigned'. The height of the bar is the average time all issues has spent in the assigned status, during those 6 months.