Project Schedule is a field that represents whether the project is on schedule or not

 

The Schedule field is currently not calculated in any way, but is included so you can manually set a schedule level on a project. 

 

This setting allows you to edit or create new Schedule levels that can be set on a project.

The image below shows the default schedules: Before, On and Behind (Before schedule, On schedule and Behind schedule):

 

Knowledge Base Images/General/Project_Schedule.PNG

 

You can add new schedule levels or edit the ones in the table. Clicking on the palette icon shows a color picker dialog.

The red "X" deletes the row.